" />
Welcome Guest Login or Signup
CHAT | INSTANT MESSENGER | BOOKMARK
| LANGUAGE:


   NEWS

Top News:
Overall
Boats
General
Sailing
Lakes
Ocean
Upcoming News:
Boats
General
Sailing
Lakes
Ocean
Hall of Fame:
Top Writers
Top Articles
Archives
RSS Feed
My Information:
My articles
Submit News
Total votes given: (log in)
Total articles written: (log in)
Total votes received: (log in)

Posted by Nellie on September 28, 2008, 12:02 pm || Total Votes: 1
FLORIDA – GULF INTRACOASTAL WATERWAY – SIESTA KEY TO TAMPA BAY – ANNA MARIA SOUND – CORTEZ/ANNA MARIA
BRIDGES: Bridge Regulation Change.(published on page 41 of USCG 2008 0117 chart 11411)

The Coast Guard is changing the operating regulations governing the Cortez bridge mile 87.4 and the Anna Maria bridge mile 89.2 across
the Gulf Intracoastal Waterway to allow for the rehabilitation of the Anna Maria Bridge. This rule will allow each bridge to open on a twice
an hour schedule, except that they will be closed to navigation in the evening; also each bridge will open once every hour during the 45
day vehicle closure period on the Anna Maria Bridge. This action is necessary for workers safety and will assist in expediting the
rehabilitation of the Anna Maria Bridge. This temporary rule is effective through 7 p.m. December 30, 2008.
Sec. 117.287 Gulf Intracoastal Waterway.
(d)(5) Cortez (SR 684) Bridge, mile 87.4. The draw shall open on signal; except that from 6 a.m. to 7 p.m., the draw shall open on the
hour and half-hour.
From September 29, 2008 to November 13, 2008, the Cortez Bridge will remain closed to navigation from 5:35 a.m. to 9:25 a.m., 1:35
p.m. to 4:25 p.m. and 8 p.m. to 4:25 a.m. At all other times, this bridge will open once an hour on the bottom of the hour.
(6) The Anna Maria (SR 64) (Manatee Avenue West) Bridge, mile 89.2. The draw shall open a single-leaf on signal; except that from 6
a.m. to 7 p.m., the draw shall open on the hour and half-hour. A double-leaf opening will be available with a one-hour notice to the bridge
tender.
From September 29, 2008 to November 13, 2008, the Anna Maria Bridge will remain closed to navigation from 6 a.m. to 9 a.m., 2 p.m. to
5 p.m. and 8 p.m. to 5 a.m., at all other times, this bridge will open once an hour on the top of the hour.
Ref: LNM 11 through 15-08 and Federal Register Docket #USCG-2008-0117
Chart: 11411 CG File: 2252/2919


Nellie reads it as the following:
Beginning September 30th:
The Cortez Bridge will open only 4:30 a.m., 5:30 a.m., 9:30 a.m., 10:30 a.m., 11:30 a.m. 12:30 p.m. 4:30 p.m., 5:30 p.m. 6:30 p.m., 7:30 p.m.
The Anna Maria Bridge will open single leaf only at 5:00 a.m., 6:00 a.m. , 9:00 a.m., 10:00 a.m., 11:00 a.m., noon, 1:00 p.m., 2:00 p.m., 5:00 p.m., 8:00 p.m.,
Already voted! | Topic:
Comments:
Comment by DannyWiedenhoft on September 29, 2008, 5:38 pm
Very useful info. Good thing we dont have to go through the bridge to get to the gulf this year for the CYC regatta
Voted up

You must be logged in to post a comment.



*** SAILMONSTER ***